========================================== Beamline Startup: High Throughput Hardware ========================================== Task list and duration ====================== A rough guide to the required actions and their durations can be found below. +------------------------------+----------------+ | Task Name | Duration (hrs) | +==============================+================+ | Remove previous installation | 3 | +------------------------------+----------------+ | Install HiTp Frame | 3 | +------------------------------+----------------+ | Install Laser Range Finder | 1 | +------------------------------+----------------+ | Align Beam | 1 | +------------------------------+----------------+ | Shift Detector forward | 1 | +------------------------------+----------------+ | Install I0 stage | 1 | +------------------------------+----------------+ | Network relevant devices | 1 | +------------------------------+----------------+ To accomodate these tasks, 1-2 days of FACI time is ideal. .. figure:: images/BasicNetwork.png :width: 600 :alt: Basic Network Representation of communications between the various devices in the HiTp setup.